Make your choice from the menu on the left side. Selected risks are shown below. If you want to limit the number of risks, select properties of the risks thats are important to you in the left menu.


      
= LOW risk level
      
= MED risk level
      
= HIGH risk level
User:
TestUsers
Client:
Costa Renewables
@Risk:
4.7 M€
Mitigated:
0.0 M€
Remaining:
4.7 M€
1 - 8 of 8 risks, sort by
Potential H2S formation in water in the monopile
Reduced oxygen in the air, will be considered as a confined space.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
53 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Potential risk of incidents if inadequate handover
Will be easier if all crew changes are conducted in the harbour but possible to change crew on location
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
919 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Fire in turbine
High temperature and gas sensors with shutdown function
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
919 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Sandbanks are continuously moving which might expose cables and cause excessive scour. Scour around jack-up legs could cause the vessel to tip over.
Monitoring and periodic inspection. Scour protection is considered conservative. Baseline survey to be completed of seabed morphology. A second survey should be commissioned for after construction (five years).Monitoring on vessel legs during jacking.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
13 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
During construction it is necessary to evacuate the tower . The protection for the crane and crane vessel needs to be verified and announced to Contractor crew.
Investigation of the earthing between the crane and the barge? Determine appropriate protection procedures during a lightning storm.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
919 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
access and egress from quayside to vessels and from vessel to vessel and vessel to WTG
Person could fall in sea water, drown get under cooled, get caught between two objects, trip, slip hazards
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
919 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Diving operations which are regarded as very hazardous. (Divers required for inspection of e.g. marine growth, cable entrance, scour during operation & maintenance)
Diving operations and and harvesting of seawed operations should be assessed.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
919 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Financial impact:
53 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
1 - 8 of 8 risks, sort by