Demo

Search

Make your choice from the menu on the left side. Selected risks are shown below. If you want to limit the number of risks, select properties of the risks thats are important to you in the left menu.


      
= LOW risk level
      
= MED risk level
      
= HIGH risk level
User:
TestUsers
Client:
Costa Renewables
@Risk:
19.3 M€
Mitigated:
0.0 M€
Remaining:
19.3 M€
1 - 10 of 18 risks, sort by
Concurrent operations risk with commissioning and start-up at the same time
Adequate interface with grid owner and procedure for energising.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Potential for critical failures if key equipment fails during heavy lifts etc.
These are critical operations
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Lifting of main components on outside of tower.
Load calculations for workplatform and other components / equipment influenced by weight. These are critical operations
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Bad weather/ high waves / Injury
Falling, Crushing, stranding, drowning
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Electrocution
Step potentials - LV/HV
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Adverse effects on marine mamals
Possible impacts arising from the proposed development include damage to hearing either permanently or temporarily from noise arising during construction activities, specifically from the installation of the turbine bases by piling. There is potential for noise arising from the construction, operation and decommissioning of the proposed development to cause either behavioural responses to, or displacement of marine mammals in the area of affect. There are also possible physical impacts to marine mammals from either collisions with vessels or impacts with vessel’s thrusters.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
3,938 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Disturbance
Possible impacts on birds arising from a wind farm include exclusion from the offshore site if birds avoid entering an area with turbines (displacement) and barrier effects, where birds avoid flying through the proposed development and have to fly further to go around it.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
3,938 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Displacement of population and barrier effects
Possible impacts on birds arising from a wind farm include exclusion from the offshore site if birds avoid entering an area with turbines (displacement) and barrier effects, where birds avoid flying through the proposed development and have to fly further to go around it.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
3,938 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Fire in turbine
High temperature and gas sensors with shutdown function
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
919 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Unexperienced people hired. This is a new type of project and experienced people for marine operations are recognised as crucial to the projects success.
Train and education according to STCW 95 standards and wind park & contractor training matrix to be reflecting that.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
1 - 10 of 18 risks, sort by