Costa Renewables
@Risk:
184.6 M€
Mitigated:
0.1 M€
Remaining:
184.5 M€
11 - 20 of 32 risks, sort by
Adverse effects on fish
Temporary hearing loss and disorientation for fish, as well as tissue damage and even death for fish arising during construction activities, specifically from the installation of the turbine bases by piling.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
41,250 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Adverse effects on marine mamals
Possible impacts arising from the proposed development include damage to hearing either permanently or temporarily from noise arising during construction activities, specifically from the installation of the turbine bases by piling. There is potential for noise arising from the construction, operation and decommissioning of the proposed development to cause either behavioural responses to, or displacement of marine mammals in the area of affect. There are also possible physical impacts to marine mammals from either collisions with vessels or impacts with vessel’s thrusters.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
3,938 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Disturbance
Possible impacts on birds arising from a wind farm include exclusion from the offshore site if birds avoid entering an area with turbines (displacement) and barrier effects, where birds avoid flying through the proposed development and have to fly further to go around it.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
3,938 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Fire, electrical fault
smoke inhalation, injury due to no early warning
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
2 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Displacement of population and barrier effects
Possible impacts on birds arising from a wind farm include exclusion from the offshore site if birds avoid entering an area with turbines (displacement) and barrier effects, where birds avoid flying through the proposed development and have to fly further to go around it.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
3,938 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Standby required to prevent access to the area and act as a rescue boat during the construction phase. During maintenance operations the transfer boat will act as standby boat if permit does not require that.
Standby/transfer boats should be hired from and operated by a sub contractor of contractor.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
2 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Some birds will be killed by the turbines. Most birds will deviate their flight path around the wind farm.
Is there a requirement to monitor bird kills (Wtbird system)?. Will there be observers during construction?.
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
17 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
May be difficult to transfer tools to top of tower
Crane provided on platform designed for tools
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
17 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Marine impact or equipment failure, fire etc.
Vessel Collisions,
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
Some sub-contractors may not have much offshore experience
HSE capabilities are assessed as part of tendering process including training, competence etc. in all phases of project
Likelihood to occur:
       
 
Consequences:
       
 
Financial impact:
289 k€
Due in:
Not specified
Owned by:
No owner assigned
Status:
Not mitigated
Priority:
No priority given
Last updated:
Not specified
11 - 20 of 32 risks, sort by